Many apologies that I have not posted before, no good excuses, but a lot has happened on the building site.
Tim would add many expletives in here, but as those of you in Adelaide know a couple of weeks ago here it rained (very unusual). This was fine and good, with the drainage connected to the rainwater tanks and the guttering ready to go, the tanks were waiting to be filled by nature's bounty. The only stumbling block was the absence of downpipes (which to this day are not in), and thus 12000 litres of water poured onto our roof and onto the ground. Big mess.
After Easter the ground around the house was still like a mudbath, so the gyprockers(who know's what they're actually called) couldn't do the eaves as planned, so they started the interior, which meant some rushed decisions re placings of light switches, heaters, etc etc. But it is going forward. And I will post some photos very soon. Promise. So the interior walls are going up, the insulation is in and everything is progressing well.