This week has seen some great progress. Plumber has been busy installing stormwater pipes to the tanks. These trenches will also carry all water supply back to the house, to fire hose reels, sprinkler systems etc. Basically some big holes and a lot of mess.... at least its not raining.


yep, big trenches


Our OzziKleen was also installed this week. This is our waste disposal system, a fully aerobic system (non-septic), miniaturised version of a standard town water treatment plant. The water that comes out at the end is clean, full of Nitrogen, sterile, and goes back onto the garden....


It goes into (another) hole in the ground. This one is definitely into the rock and keeping excavator busy.


And as if that wasn't enough this week, Hebel walls were finished off and rendering has started.